Infrastructure Priority List

Northern Sydney Freight Corridor Stage 2

Northern Sydney Freight Corridor Stage 2

Infrastructure Australia | Infrastructure Priority List |

Northern Sydney Freight Corridor Stage 2

PROJECT STAGE
EARLY STAGE PROPOSAL
EARLY STAGE PROPOSAL
EARLY STAGE PROPOSAL
POTENTIAL INVESTMENT OPTIONS
POTENTIAL INVESTMENT OPTIONS
POTENTIAL INVESTMENT OPTIONS
INVESTMENT READY PROPOSAL
INVESTMENT READY PROPOSAL
INVESTMENT READY PROPOSAL
PROJECT DELIVERY
PROJECT DELIVERY
PROJECT DELIVERY
PROJECT DELIVERY
POST COMPLETION REVIEW
LOCATION
Sydney, NSW
SECTOR
Transport
PROPONENT
NSW Government
A graphic of the Australian continent with NSW state shaded and small dot representing Sydney.
Problem

Demand for rail freight in the Newcastle to Sydney corridor, using the Main North Rail Line, is projected to continue growing over the coming decades.

Stage 1 improvements to the Northern Sydney Freight Corridor have increased the corridor’s capacity by 50%, from 29 to 44 freight trains each day. This will accommodate growth in demand for rail freight up until 2028. In the longer term, the Sydney metropolitan rail network will again become a point of bottleneck for the rail freight network, mainly because of priority given to passenger rail services.

Potential investment options

A second package of infrastructure improvements in the corridor would build on the earlier package to deliver a significant increase to core period (5 am to 10 pm) rail freight capacity, along with improved average transit times for freight services. This would also improve freight and passenger service reliability along the Main North Rail Line between Strathfield in Sydney and Broadmeadow in Newcastle.

The candidate projects for the second package include Rhodes to West Ryde quadruplication and additional track capacity between Thornleigh and Hornsby (known as the Thornleigh to Hornsby Third Track project).

The NSW Government has completed a preliminary design for Rhodes to West Ryde quadruplication and Thornleigh to Hornsby Third Track. The scoping and timing of this work is currently being developed in conjunction with a response to the Sydney rail network capacity proposal, which is separately listed on the Infrastructure Priority List.

Next Steps

Proponent to complete business case development (Stage 3 of Infrastructure Australia’s Assessment Framework).