Infrastructure Priority List

Melbourne level crossings removal

Melbourne level crossings removal

Infrastructure Australia | Infrastructure Priority List |

Melbourne level crossings removal

PROJECT STAGE
EARLY STAGE PROPOSAL
EARLY STAGE PROPOSAL
EARLY STAGE PROPOSAL
POTENTIAL INVESTMENT OPTIONS
POTENTIAL INVESTMENT OPTIONS
POTENTIAL INVESTMENT OPTIONS
INVESTMENT READY PROPOSAL
INVESTMENT READY PROPOSAL
INVESTMENT READY PROPOSAL
PROJECT DELIVERY
PROJECT DELIVERY
PROJECT DELIVERY
PROJECT DELIVERY
POST COMPLETION REVIEW
LOCATION
Melbourne, VIC
SECTOR
Transport
PROPONENT
Victorian Government
A graphic of the Australian continent with shaded State of Victoria, and small dot representing Melbourne.
Problem

Melbourne’s transport network includes approximately 180 road/rail level crossings. Road traffic at these level crossings is managed by boom gates that give priority to trains. Level crossings interrupt the flow of road traffic and contribute to congestion and delays on Melbourne’s roads. The 2019 Australian Infrastructure Audit projected that the cost of road congestion in the Melbourne/Geelong area is expected to reach approximately $10.4 billion by 2031.

As Melbourne’s train network is modernised, longer and more frequent trains are planned to be introduced to the network to cater for increased demand. Longer and more frequent trains at level crossings will increase delays for road users.

Level crossings also introduce a ‘conflict point’ between rail and road traffic, which creates safety issues. Incidents at level crossings, including collisions and signal faults, impact the efficiency and reliability of Melbourne’s transport network.

Potential investment options

This proposal proposes to remove priority level crossings in Melbourne. The objective of the proposal is to deliver a more reliable, convenient, productive and safer transport system in Melbourne.

Next Steps

The Victorian Government, through the Level Crossing Removal Authority, is delivering 110 level crossing removals across metropolitan Melbourne. Major construction commenced in 2015 with 67 level crossings removed by November 2021. All 110 committed level crossings will be removed by 2030.